72 hours running test report for 2T/h film sulphonation plant of ZHONGQING YILAN
 
¢ñ. During the 72 hours running period, analysis results of product quality at control points are in TABLE 1:
 
TABLE 1, data sheet of analysis results
No.
Date and time
Active matter (%)
Free oil (%)
Free sulphonic acid (%)
Color (klett)
Conclusion
1
2007-3-13 12:00
97.02
0.26
1.23
18
COMPLIES
2
2007-3-13 16:00
97.61
0.17
1.2
17
COMPLIES
3
2007-3-13 20:00
97.51
0.35
1.09
16
COMPLIES
4
2007-3-14 00:00
97.5
0.26
1.03
16
COMPLIES
5
2007-3-14 04:00
97.52
0.43
0.98
17
COMPLIES
6
2007-3-14 08:00
97.27
0.43
0.98
17
COMPLIES
7
2007-3-14 12:00
97.51
0.7
1.16
16
COMPLIES
8
2007-3-14 16:00
97.44
0.26
1.19
13
COMPLIES
9
2007-3-14 20:00
97.32
0.78
1.02
16
COMPLIES
10
2007-3-15 00:00
97.15
0.61
1.04
13
COMPLIES
11
2007-3-15 04:00
97.25
0.61
0.96
15
COMPLIES
12
2007-3-15 08:00
97.24
0.87
0.87
14
COMPLIES
13
2007-3-15 12:00
97.37
0.9
0.87
13
COMPLIES
14
2007-3-15 16:00
97.05
0.43
1.22
24
COMPLIES
15
2007-3-15 20:00
97.74
0.43
1.28
25
COMPLIES
16
2007-3-16 00:00
96.92
0.87
0.93
19
COMPLIES
17
2007-3-16 04:00
97.32
0.43
1.06
13
COMPLIES
Average
 
97.34
0.53
1.07
17
COMPLIES
 
¢ò. The final analysis result of 72 running test is as TABLE 2:
 
TABLE 2, The final analysis result
No.
Analysis Date and tank No.
Active matter (%)
Free oil (%)
Free sulphonic acid (%)
Color (klett)
Conclusion
1
2007-3-15 5# tank
97.02
1.34
1.14
18
COMPLIES
2
2007-3-17 1# tank
96.88
1.29
1.1
18
COMPLIES
Average
2 tank sample
96.95
1.315
1.12
18
COMPLIES
 
Test conclusion: During 72 hours testing period, the analysis results in the producing time and analysis results of final product all achieve the design requirement for this plant. 
 
 
¢ó. 72 hours consume quantity test-results are as Table 3:
 
TABLE 3, the design requirements and actual consume quantity
 ITEM
Requirements in contract
(per 1 MT of LAS)
Results tested by metering
(per 1 MT of LAS)
Consume quantity of LAB
¡Ü744.0©K/t
740.1©K/t
Consume quantity of sulfur
¡Ü106.5©K/t
101.4©K/t
Consume quantity of 30% liquid sodium hydrate
¡Ü27.0©K/t
13.34©K/t
Consume quantity of electric power
¡Ü150kwh/t
99.3kwh/t
Consume quantity of process water
¡Ü12t/h
0.235 t/h
Consume quantity of steam
¡Ü0.34 t/h
Not tested as don¡¯t have test instrument
Consume quantity of instrument air
¡Ü30Nm3/h
Not tested as don¡¯t have test instrument
 
Test conclusion£ºthe actual test results of consume quantity £¨except steam and instrument items£© in 72 hours running all achieve the requirement of plant design. 
 
¢ô. Testing result of effluents in 72 hours running:
It¡¯s tested by a professional inspect institution consigned by safety-production manage department. The result is as TABLE 4:
 
TABLE 4 DATA sheet of effluents of sulphonation plant.
ITEM
Requirements in contract
Test result
Conclusion
SO2 content in gaseous effluents
GB16297-96
36mg/stere
COMPLIES
The tiptop let speed permitted
¡Ü11kg/h
2.6kg/h
COMPLIES
PH value control bound of alkali waste water
7¡«10
8
COMPLIES
Design requirement for the noise out of blower  house
¡Ü85·Ö±´
Place 1#: 82.1db
COMPLIES
Place 2#: 82.7db
COMPLIES
Test conclusion: The testing results comply to standard.
Time:2007-7-5