Location | Capacity kg/h |
Subject | Production Date |
South Korea | 3800 | Unit 89 ultra-low dioxane SLES renovation | Under Construction |
Germany | 3800 | Ultra-low dioxane SLES renovation | Under Construction |
Russia | 1600 | LAS SLES turnkey plant with a single-tube pilot plant | Under Construction |
China Lichen | 5000 | Unit 60 Reaction Heat Recovery | Under Construction |
China Lichen | 7200 | ESP replacement | Under Construction |
Tanzania | 2000 | Unit 68 Waste Heat Recovery + SO3 cooler replacement | Under Construction |
India 5 | 40 | Turnkey single-tube pilot plant | Under Construction |
North-west Africa | 2500 | Turnkey LAS SLES plant, with Super Silicone Continuous Air Drying Technology (-70°C dew point, no two-tank switching fluctuations) | Under Construction |
Bangladesh 2 | 2000 | SLES production facility | Under Construction |
China Jintung | 6000 | 8tph ESP and 6tph Unit 38 Waste Water Crystalization | Under Construction |
India Solvay | 3000 | AOS unit | Under Construction |
China Richful | 124.8 | 3-tube skid-mounted pilot plant | Under Construction |
South-East Asia | 8000 | Turnkey 8tph (with 192-tube reactor, the largest) LABSA and 10tph SLES SLS plant with Unit 69 Reaction heat recovery (for 15%+ electricity saving) and Unit 38 Waste Water Crystalization | Under Construction |
Mexico | 5000 | SLES producing unit key equipment | Under Construction |
Honduras | 2000 | Turnkey LAS plant | Under Construction |
Malaysia | 3000 | Post degassing system | 2025.4 |
Vietnam 4 | 7500 | Turnkey LABSA & SLES plant with 180-tube reactor | 2025.2 |
China Weifang | 3000 | Turnkey LAS plant | 2025.1 |
China Sinolight | 5000 | 120-tube reacter set replacement | 2024.12 |
South-East Asia | 5000 | Old control system upgrade and 6tph ESP replacement | 2024.9 |
Saudi Arabia | 41.6 | 1-tube skid-mounted pilot plant | 2024.9 |
Russia | 3800 | Exhuast gas treatment renovation and neutralization reactor replacement | 2024.8 |
China Lichen | 7000 | Revamp non-backmixing static mixed aging system, active matter ≥ 97.5% | 2024.8 |
Indonesia 1 | 5000 | Multiple ESPs replacement | 2024.7 |
West Asia | 3000 | Reactor replacement | 2024.6 |
Chile | 2000 | Reaction tube replacement | 2024.6 |
China Richful | 5000 | Turkney HABSA plant, with Unit 68 waste heat recovery system | 2024.5 |
China Solvay | 1000 | Exhuast gas treatment renovation | 2024.4 |
Argentina | 4000 | 2t/hr SO2 cooler (310S) + 4t/hr ESP replacement | 2024.1 |
Ethiopia 1 | 3000 | 3000m3 palm oil storage tank farm | 2024.1 |
Egypt | 3000 | Scrubber, heat exchanger and ESP replacement | 2024.1 |
India Solvay | 3000 | ESP replacement | 2023.12 |
India 1 | 4000 | Reactor replacement | 2023.11 |
China Lizhi | 3800 | Ultra-low dioxane SLES renovation for meeting P&G's future requirement | 2023.11 |
China Sinolight | 5000 | Revamping from 3.8t/hr to 5t/hr SLES plant, including reactor and other key equipment | 2023.9 |
Bangladesh 2 | 2000 | Turnkey LAS plant with Waste Heat Recovery | 2023.7 |
China Lichen | 208 | Turnkey 5-tube pilot plant for producing IOS and other small batch products | 2023.6 |
China National Institute of Chemical Industry (CNIC) | 2000 | C15 alpha-olefin sulfonation sulfonate research project | 2023.6 |
Egypt | 3000 | ESP replacement | 2023.4 |
Petrochina Huayang | 1600 | Unit 68 waste heat recovery system | 2023.3 |
Ethiopia | 3800 | Turnkey LAS and sulphuric acid integrated plant (1.2tph 98% sulphuric acid capacity), with Unit 38 Waste Water Evaporation and Cystalization | 2023.2 |
India 3 | 7000 | ESP replacement | 2023.1 |
Sasol China | 1600 | Acid Absorption Unit | 2023.1 |
China Nanjing Jintung | 3800 | Unit 68 Waste Heat Recovery | 2022.11 |
China Shengtai | 6000+5000 | Turnkey LAS SLES AOS plant | 2022.9 |
Pakistan 3 | 3000 | LAS SLES Turnkey plant with Unit 69 Reaction Heat Recovery | 2022.8 |
Pakistan 1 | 6000 | LAS turnkey plant (second phase), 144-tube new-gen reactor, SLES dilution for the first plant | 2022.6 |
China Sichuan Jintung | 3800*2 | Unit 68 Waste Heat Recovery | 2022.4 |
Turkey 1 | 6000 | Turnkey LAS SLES SLS plant with European Union PED Standard | 2022.2 |
China Huimiao | 7500 | 7.5tph LAS 10tph SLES SLS 15tph AOS plant with 180-tube reactor and waste heat recovery | 2022.2 |
China Hunanlichen | 4000+5000 | Unit 69 Reaction Heat Recovery | 2022.2 |
China Yifeng | 120 | 3-tube reactor pilot plant | 2022.2 |
Sinopec Chengdu | 2000 | ESP replacement | 2022.1 |
China Anyangtianhong | 2000 | Reactor and aging vessel | 2022.1 |
Vietnam 1 | 3000 | Adding Unit 68 Waste Heat Recovery | 2022.1 |
China Anhui Jintung | 5000+1000 | Unit 79 Neutralization revamping | 2021.12 |
China Sichuan Jintung | 3800 | Unit 79 SLES neutralization and 68 revamping | 2021.12 |
Vietnam 1 | 3800 | Unit 68 waste heat recovery and SO3 cooler | 2021.8 |
China ZZY Meishan | 3800*2 | Weixian new-gen reactor | 2021.7 |
India 4 | 5000 | Turnkey LAS SLES SLS Unit 69 Reaction Heat Recovery | 2021.4 |
Bangladesh 1 | 1000 | Turnkey LAS SLES plant | 2022.2 |
West Asia 2 | 1200 | Turnkey LAS SLES plant | 2022.2 |
Pakistan 2 | 6000 | Turnkey LAS SLES plant with Unit 68 and SLES Dilution | 2021.2 |
Indonesia 1 | 6000 | Turnkey LABSA SLES Unit 68 plant | 2021.11 |
Yeman 1 | 2000 | Reactor replacing Italian one | 2021.5 |
China ZZY Henan | 5000*4 | 4 New-gen Reactors with Exhaust circulation process, sulfur buring and SO3 convertion | 2021.1 |
China Zhongqing | 3800 | Old plant Exhaust Treatment and organic material recovery revamping, reducing carry over in exhaust by 50%+ | 2021.11 |
China Zhongqing | 6000 | Turnkey LAS SLES plant with Unit 68 Unit 38 and Unit 08 | 2021.6 |
India 1 South | 5000 | Turnkey LAS, SLES and SLS plant with Unit 69 | 2021.4 |
China Jintai | 2000 | Static-mixing level-controllable aging and stabilization | 2021.1 |
China Shandongweifang | 5000 | New-gen reactor replacing old one | 2020.11 |
Shandong Jining | 3800 | LAS SLES AOS turnkey plant design | 2020.1 |
India 1 | 4000 | Turnkey LAS SLES AOS SLS plant with Unit 69 | 2020.9 |
China Tianzhi | 3800 | The second Unit 79 Neutralization replacing Double-step Neutralization | 2020.9 |
China Anyangtianhong | 800 | 19-tube reactor replacing the old one | 2020.8 |
China Xinxianghuimiao | 1000 | SLS Film scraping, drying, tablet pressing and needle extrusion plant | 2020.8 |
China Anhuianqing | 3800 | Weixian reactor replacing Italian one for LAS SLES AOS production | 2020.7 |
China Lichenshanghai | 10000 | The largest 10tph ESP | 2020.6 |
China Lichenguangdong | 6000*2 | Two reactors replacing Italian ones and Unit 38 | 2020.4 |
China ZZY Jiaxing | 3800 | Adopting Weixian reactor with liquid SO3 evaporation and exhaust circulation process | 2020.4 |
China Shandonglongkou | 2000 | Turnkey LAS plant | 2020.3 |
China Lichenshanghai | 6000+5000 | New 6tph plant and old 5tph Italian plant revamping including replacing reactor | 2020.3 |
China Lichenhunan | 5000 | 5tph New waste heat systme, 5tph aging vessel*2, 3.8tph ESP*2 | 2020.3 |
India 3 | 6000 | Turnkey LAS plant with Unit 79 and 68 | 2019.9 |
Vietnam 3 | 3000 | Turnkey LAS with Unit 68 | 2019.9 |
Sasol China | 1600 | Weixian reactor replacing Italian one, for sulfation of various fatty alcohol ethers | 2019.9 |
Vietnam 2 | 1600 | Turnkey SLES plant Unit 79 | 2019.8 |
Xinxiang Huimiao | 1000 | SLS film Scraping drying plant | 2019.6 |
Sudan | 2500 | Turnkey LAS SLES Unit 68 | 2019.6 |
China Huizhouzhisheng | 3800 | Unit 79 Neutralization replacing Vacuum Neutralization | 2019.3 |
India 2 | 2000 | Weixian reactor replacing Italian one for LAS SLES and AOS producetion | 2019.2 |
China Sichuan Jintung | 3800 | Unit 79 SLES Neutralization replacing Double-step Neutralization | 2019.2 |
Vietnam 1 | 3000 | Neutralization reactor and waste heat recovery | 2019.12 |
Pakistan 1 | 3000 | Turnkey LAS SLES Unit 68 | 2019.1 |
China Xinxianghuimiao | 3800+6000 | Turnkey LAS SLES AOS SLS plant with Unit 38 Unit 69 | 2019.1 |
Ethiopia 1 | 1600 | Turnkey SLES Unit 79 | 2018.9 |
South Korea | 3800 | Revamping old Italian SLES neutralization and adding pump neutralization | 2018.7 |
China Guangzhou Iiby | 1600 | Replacing old reactor for AOS production | 2018.6 |
China Anhui Jintung | 3800 | SLES Unit 79 and Unit 68 waste heat recovery | 2018.5 |
China Shijiazhuang | 600 | MES turnkey plant with 14-tube reactor | 2018.4 |
South Korea 1 | 6000 | Turnkey LAS SLES plant with Unit 68 | 2018.2 |
China Shengtailianshui | 2000*2 | Two LAS SLES AOS plants | 2017.8 |
South Korea 1 | 2500 | Weixian ESP replacing American one | 2017.2 |
China Xinxianghongtai | 3800 | Turnkey LAS SLES with Unit 68 | 2017.11 |
China Shengtaixinjiang | 2000 | Turnkey LAS SLES plant with Unit 38 Waste Water Evapration and Cystalization | 2017.11 |
Shangdong Libo | 3800 | SO2 cooler and SO3 cooler replacement | 2017.6 |
China Yishuidongxin | 2000 | LAS Turnkey plant | 2017.1 |
China Anyangtianhong | 800+1300 | Two turnkey plant with a 3-stage Waste Heat Recovery for hot water genaration | 2017.1 |
Ethiopia 1 | 1600 | Turnkey LAS SLES plant with Unit 68 | 2016.7 |
China Anyangxinya | 3800 | Weixian Unit 79 Neutralization replacing Vacuum Neutralization | 2016.5 |
China Tianjintianzhi | 3800 | Weixian Unit 79 Neutralization replacing Double-step Neutralization | 2016.4 |
India 1 | 2000 | Weixian 48-tube reactor replacing Italian | 2016.3 |
China Xinxianghongtai | 2000 | Weixian new reactor replacing old one and adding AOS | 2016.11 |
Vietnam 1 | 3000 | Reactor and Unit 79 | 2015.5 |
China Kunming Liby | 3800 | Critical equipment | 2015.7 |
China Shandonglongkou | 2000 | Turnkey LAS SLES Unit 68 | 2014.4 |
West Asia 1 | 2500 | Weixian reactor replacing Italian one | 2014.7 |
China Jinandongxin | 2000 | AOS plant | 2014.10 |
China Anyangxinya | 40 | Pilot plant | 2013.2 |
China Xinxianghongtai | 2000 | Turnkey LAS SLES AOS plant with Unit 68 | 2013.9 |
China Shengtailianshui | 3800 | Turnkey SLES plant Unit 79 and Unit 68 | 2013.8 |
P&G Beijing | 2000 | New reactor and revamping | 2013.5 |
China Sasol | 1600 | Unit 79 Neutralization replacing Double-step Neutralization, 1-4 dioxane content 3ppm | 2013.7 |
Hebei Jinzhou | 2000 | Turnkey LABSA.SLES | 2012.2 |
Vietnam 1 | 3000 | Critical equipment and Unit 79 | 2012.2 |
China Sichuan Jintung | 3800*2 | One Unit 68 Waste Heat for two plants | 2012.1 |
Syria | 1000 | LAS and SLES turnkey plant | 2012.2 |
Shandong Dongxin | 1100 | Turnkey LAS plant | 2012.6 |
China ZZY Shaoguan | 3800 | Turnkey LAS SLES plant | 2012.6 |
China Shanghaijingdi | 6000 | ESP Disc-and-tube type | 2012.5 |
China Shijiazhuangtongye | 1200 | LAS turnkey plant | 2012.3 |
Nanjing Jintung | 3800 | Waste heat recovery | 2012.2 |
China Anhui Jintung | 120 | 3-tube reactor pilot plant | 2011.12 |
China Fushun | 1600 | Turnkey LAS | 2011.2 |
Xinji Rongchao | 400 | Oil sulphonation | 2011.8 |
Anyang Tianhong | 1200 | New generation reactor and ESP replacement | 2011.1 |
Note: shown above are just partial projects of Weixian |