Location |
Capacity kg/h |
Note |
Production Date |
India Solvay |
3000 |
AOS unit |
Under Construction |
China Richful |
124.8 |
3-tube skid-mounted pilot plant |
Under Construction |
South East Asia |
8000 |
Turnkey 8tph LABSA and 10tph SLES SLS plant with Unit 69 Reaction Heat recovery and Unit 38 Waste Water Cystalization |
Under Construction |
Vietnam 4 |
7500 |
Turnkey LABSA & SLES plant with 180-tube reactor |
Under Construction |
Argentina |
4000 |
ESP and SO2 heat exchanger(310S) |
Under Construction |
Malaysia |
3000 |
Italian old plant SLES product quality improvement of pH stability,appearance and residual oxygen level |
Under Consturction |
Russia |
3800 |
Exhaust gas treatment renovation |
Under Construction |
Saudi Arabia |
41.6 |
1-tube skid-mounted pilot plant
|
Under Construction |
Mexico |
5000 |
SLES producint unit key equipment |
Under Construction |
West Asia 3 |
1600 |
Turnkey LAS SLES plant, with Unit 68 Waste Heat Recovery, 37-tube new-gen reactor, Unit 79 Neutralization
|
Under Construction |
Honduras 1 |
2000 |
Turnkey LAS, with Unit 69, Unit 38 Waste Water Evaporation and Cystalization.
|
Under Construction |
China Shandongweifang |
3000 |
Turnkey LAS plant |
Under Construction |
Iran |
3000 |
Reactor replacement |
2024.6 |
China Richful |
5000 |
Turnkey HABSA plant, with Unit 68 waste heat recovery system
|
2024.5 |
Ethiopia 1 |
3000 |
3000Mt Palm oil storage tanks
|
2024.1 |
India Solvay |
3000 |
ESP replacement
|
2023.12
|
India 1 |
4000 |
Reactor replacement
|
2023.11 |
China Lichen |
3800 |
Ultra-low dioxane SLES renovation for meeting P&G's future requirement |
2023.11 |
China SL |
5000 |
Revamping from 3.8t/hr to 5t/hr SLES plant, including reactor and other key equipment |
2023.11 |
China Hunanlichen |
208 |
Turnkey 5-tube pilot plant |
2023.6 |
Bangladesh 2
|
2000 |
Turnkey LAS plant with Waste Heat Recovery
|
2023.7 |
Ethiopia 1 |
3800 |
Turnkey LAS and sulphuric acid integrated plant (1.2tph 98% sulphuric acid capacity), with Unit 68, Unit 08 sulfuric acid absorbtion, Unit 38 Waste Water Evaporation and Cystalization
|
2023.2 |
China Nanjing Jintung |
3800 |
Unit 68 Waste Heat Recovery key equipment |
2022.11 |
China Sichuan Jintung |
3800*2 |
Unit 68 Waste Heat Recovery |
2022.4 |
Pakistan 1 |
6000 |
LAS turnkey plant (second), 144-tube new-gen reactor, SLES dilution for the first plant |
2022.6 |
Pakistan 3 |
3000 |
LAS SLES Turnkey plant with Unit 69 |
2022.8 |
China Shengtai |
6000+5000 |
Turnkey LAS SLES AOS plant |
2022.9 |
Turkey 1 |
6000 |
Turnkey LAS SLES SLS plant European Union PED Standard |
2022.2 |
China MeishanHuimiao |
7500 |
The world largest LAS SLES SLS AOS plant with 180-tube reactor and waste heat recovery |
2022.2 |
China Hunanlichen |
4000+5000 |
Unit 69 Reaction Heat Recovery |
2022.2 |
China Yifeng |
120 |
3-tube reactor pilot plant |
2022.2 |
China Anyangtianhong |
2000 |
Reactor and aging vessel |
2022.1 |
Vietnam 1 |
3000 |
Adding Unit 68 Waste Heat Recovery |
2022.1 |
China Keshihua |
100000 |
Petroleum sulfonate, new process of exhaust circulation, single pipe pilot plant |
2021.11 |
China Anhui Jintung |
5000+1000 |
Unit 79 Neutralization revamping |
2021.12 |
China Sichuan Jintung |
3800 |
Unit 79 and 68 revamping |
2021.12 |
China ZZY Meishan |
3800*2 |
Weixian new-gen reactor |
2021.7 |
India 4 |
5000 |
Turnkey LAS SLES SLS Unit 69 Reaction Heat Recovery |
2021.4 |
Bangladesh 1 |
1000 |
Turnkey LAS SLES plant |
2022.2 |
Middle east 2 |
1200 |
Turnkey LAS SLES plant |
2022.2 |
Pakistan 2 |
6000 |
Turnkey LAS SLES plant with Unit 68 and SLES Dilution |
2021.2 |
Indonesia 1 |
6000 |
Turnkey LASBSA SLES Unit 68 plant |
2021.11 |
Yeman 1 |
2000 |
Reactor replacing Italian one |
2021.5 |
China ZZY Henan |
5000*4 |
4 New-gen Reactors with Exhaust circulation process, sulfur buring and SO3 converting |
2021.1 |
China Zhongqing |
3800 |
Old plant Exhaust Treatment and organic material recovery revamping, reducing consumption in exhaust 50%+ |
2021.11 |
China Zhongqing |
6000 |
Turnkey SLES plant with Unit 68 Unit 38 and Unit 08 |
2021.6 |
China Jintai |
2000 |
Static-mixing level-controllable aging and stabilization |
2021.1 |
China Shandongweifang |
5000 |
New-gen reactor replacing old one |
2020.11 |
China Shandongjining |
3800 |
LAS SLES AOS plant design |
Feasibility study |
India 1 |
4000 |
Turnkey LAS SLES AOS SLS plant with Unit 69 |
2020.9 |
China Tianzhi |
3800 |
The second Unit 79 Neutralization replacing Double-step Neutralization |
2020.9 |
China Anyangtianhong |
800 |
19-tube reactor replacing the old |
2020.8 |
China Xinxianghuimiao |
1000 |
SLS Film scraping, drying, tablet pressing and needle extrusion plant |
2020.8 |
China Anhuianqing |
3800 |
Weixian reactor replacing Italian one for LAS SLES AOS production |
2020.7 |
China Lichenshanghai |
10000 |
The largest ESP in the world |
2020.6 |
China Lichenguangdong |
6000*2 |
Two reactors replacing Italian ones, Unit 38 |
2020.4 |
China ZZY Jiaxing |
3800 |
Adopting Weixian reactor with liquid SO3 evaporation and exhaust circulation process |
2020.4 |
China Shandonglongkou |
2000 |
Turnkey LAS plant |
2020.3 |
China Lichenshanghai |
6000+5000 |
New 6tph plant and old 5tph Italian plant revamping including replacing reactor |
2020.3 |
China Lichenhunan |
5000 |
5tph New waste heat systme, 5tph aging vessel*2, 3.8tph ESP*2 |
2020.3 |
India 3 |
6000 |
Turnkey LAS plant with Unit 79 and 68 |
2019.9 |
Vietnam 3 |
3000 |
Turnkey LAS with Unit 68 |
2019.9 |
China Sasol |
1600 |
Weixian reactor replacing Italian one, for sulfation of various fatty alcohol ethers |
2019.9 |
Vietnam 2 |
1600 |
Turnkey SLES plant Unit 79 |
2019.8 |
Sudan |
2500 |
Turnkey LAS SLES Unit 68 |
2019.6 |
China Huizhouzhisheng |
3800 |
Unit 79 Neutralization replacing Vacuum Neutralization |
2019.3 |
India 2 |
2000 |
Weixian reactor replacing Italian one for LAS SLES and AOS producetion |
2019.2 |
China Sichuan Jintung |
3800 |
Unit 79 SLES Neutralization replacing Double-step Neutralization |
2019.2 |
Vietnam 1 |
3000 |
Neutralization reactor and waste heat recovery |
2019.12 |
Pakistan 1 |
3000 |
Turnkey LAS SLES Unit 68 |
2019.1 |
China Xinxianghuimiao |
1000 |
SLS film scraping, drying, tablet pressing and needle pressing plant |
2019.6 |
China Xinxianghuimiao |
3800+6000 |
Turnkey LAS SLES AOS SLS plant with Unit 38 Unit 69 |
2019.1 |
Ethiopia 1 |
1600 |
Turnkey SLES Unit 79 |
2018.9 |
South Korea 1 |
3800 |
Revamping old Italian SLES neutralization and adding pump neutralization |
2018.7 |
China Guangzhou Iiby |
1600 |
Replacing old reactor for AOS production |
2018.6 |
China Anhui Jintung |
3800 |
SLES Unit 79 and Unit 68 waste heat recovery |
2018.5 |
China Shijiazhuang |
600 |
MES turnkey plant with 14-tube reactor |
2018.4 |
South Korea 1 |
6000 |
Turnkey LAS SLES plant with Unit 68 |
2018.2 |
China Shengtailianshui |
2000*2 |
Two LAS SLES AOS plants |
2017.8 |
China Shandonglibo |
3800 |
SO2 and SO3 coolers |
2017.6 |
South Korea 1 |
2500 |
Weixian ESP replacing American one |
2017.2 |
China Xinxianghongtai |
3800 |
Turnkey LAS SLES with Unit 68 |
2017.11 |
China Shengtaixinjiang |
2000 |
Turnkey LAS SLES plant with Unit 38 Waste Water Evapration and Cystalization |
2017.11 |
China Yishuidongxin |
2000 |
LAS Turnkey plant |
2017.1 |
China Anyangtianhong |
800+1300 |
Two turnkey plant with a 3-stage Waste Heat Recovery for hot water genaration |
2017.1 |
Ethiopia 1 |
1600 |
Turnkey LAS SLES plant with Unit 68 |
2016.7 |
China Anyangxinya |
3800 |
Weixian Unit 79 Neutralization replacing Vacuum Neutralization |
2016.5 |
China Tianjintianzhi |
3800 |
Weixian Unit 79 Neutralization replacing Double-step Neutralization |
2016.4 |
India 1 |
2000 |
Weixian 48-tube reactor replacing Italian one |
2016.3 |
China Xinxianghongtai |
2000 |
Weixian new reactor replacing old one and adding AOS |
2016.11 |
Vietnam 1 |
3000 |
Reactor and Unit 79 |
2015.5 |
China Kunming Liby |
3800 |
Critical equipment |
2015.7 |
China Shandonglongkou |
2000 |
Turnkey LAS SLES Unit 68 |
2014.4 |
Middle east 1 |
2500 |
Reactor replacing old one AES LAS |
2014.7 |
China Jinandongxin |
2000 |
AOS plant |
2014.1 |
China Anyangxinya |
40 |
Pilot plant |
2013.2 |
China Xinxianghongtai |
2000 |
Turnkey LAS SLES AOS plant with Unit 68 |
2013.9 |
China Shengtailianshui |
3800 |
Turnkey SLES plant Unit 79 and Unit 68 |
2013.8 |
China Jinyu |
2000 |
New reactor and revamping |
2013.5 |
China Sasol |
1600 |
Unit 79 Neutralization replacing Double-step Neutralization, 1-4 dioxane content 4ppm |
2013.7 |
Vietnam 1 |
3000 |
Critical equipment and Unit 79 |
2012.2 |
China Hebeijinzhou |
2000 |
Turnkey LAS SLES plant LABSA.AES |
2012.2 |
China Nanjing Jintung |
3800 |
Unit 68 |
2012.2 |
China Sichuan Jintung |
3800*2 |
One Unit 68 Waste Heat for two plants |
2012.1 |
Syria |
1000 |
LAS and SLES turnkey plant |
2012.2 |
China ZZY Shaoguan |
3800 |
Turnkey LAS SLES plant |
2012.6 |
China Yishuidongxin |
1100 |
Turnkey LAS plant LAS |
2012.6 |
China Shanghaijingdi |
6000 |
ESP Disc-and-tube type |
2012.5 |
China Shijiazhuangtongye |
1200 |
LAS turnkey plant |
2012.3 |
China Xinjirongchao |
400 |
Turnkey plant |
2011.8 |
China Fushunxihua |
1600 |
LAS turnkey plant LABSA |
2011.2 |
China Anhui Jintung |
120 |
3-tube reactor pilot plant |
2011.12 |
China Anyangtianhong |
1200 |
Reactor and ESP |
2011.1 |
China Xi'annanfeng |
3800 |
Unit 68 |
2010.9 |
China P&G Guangzhou |
1200 |
Air drying unit |
2010.7 |
China Shanghaijingdi |
3000 |
LAS turnkey plant LABSA |
2010.7 |
Kenya |
1000 |
Instrumentation and control system |
2010.5 |
China ZZY Shaoguan |
2000 |
Turnkey LAS SLES AOS and Exhaust Gas Circulation process |
2010.4 |
China Anhui Jintung |
3800 |
Unit 68 and Air Drying |
2010.1 |
Note: shown above are just partial projects of Weixian
|