Location | Capacity kg/h |
Note | Production Date |
Vietnam 4 | 7500 | Turnkey LABSA & SLES plant with 180-tube reactor | Under Construction |
Ethiopia 1 | 3000 | 3000Mt Palm oil storage tanks | Under Construction |
China | 5000 | Revamping from 3.8t/hr to 5t/hr SLES plant, including reactor and other key equipment | Under Construction |
China Hunanlichen | 208 | Turnkey 5-tube pilot plant | Under Construction |
Mexico | 5000 | SLES producing unit key equipment | Under Construction |
China Henananyang 4 | 5000 | Turkney HABSA plant, with Unit 68 waste heat recovery system | Under Construction |
China Nanjing Jintung | 3800 | Unit 68 Waste Heat Recovery key equipment | 2022.11 |
Middle east 3 | 1600 | Turnkey LAS SLES plant, with Unit 68 Waste Heat Recovery, 37-tube new-gen reactor, Unit 79 Neutralization | Under Construction |
China Sichuan Jintung | 3800*2 | Unit 68 Waste Heat Recovery | 2022.4 |
Bangladesh 2 | 2000 | Turnkey LAS plant with Waste Heat Recovery | Under Construction |
Ethiopia 1 | 3800 | Turnkey LAS plant, with Unit 68, Unit 08 sulfuric acid absorbtion, Unit 38 Waste Water Evaporation and Cystalization | 2023.2 |
Honduras 1 | 2000 | Turnkey LAS, with Unit 69, Unit 38 Waste Water Evaporation and Cystalization. | Under Construction |
China Shangdongweifang | 3000 | LAS plant | Under Construction |
Pakistan 1 | 6000 | LAS turnkey plant (second), 144-tube new-gen reactor, SLES dilution for the first plant | 2022.6 |
Pakistan 3 | 3000 | LAS SLES Turnkey plant with Unit 69 | 2022.8 |
China Shengtai | 6000+5000 | Turnkey LAS SLES AOS plant | 2022.9 |
Turkey 1 | 6000 | Turnkey LAS SLES SLS plant European Union PED Standard | 2022.2 |
China MeishanHuimiao | 7500 | The world largest LAS SLES SLS AOS plant with 180-tube reactor and waste heat recovery | 2022.2 |
China Hunanlichen | 4000+5000 | Unit 69 Reaction Heat Recovery | 2022.2 |
China Yifeng | 120 | 3-tube reactor pilot plant | 2022.2 |
China Anyangtianhong | 2000 | Reactor and aging vessel | 2022.1 |
Vietnam 1 | 3000 | Adding Unit 68 Waste Heat Recovery | 2022.1 |
China Keshihua | 100000 | Petroleum sulfonate, new process of exhaust circulation, single pipe pilot plant | 2021.11 |
China Anhui Jintung | 5000+1000 | Unit 79 Neutralization revamping | 2021.12 |
China Sichuan Jintung | 3800 | Unit 79 and 68 revamping | 2021.12 |
China ZZY Meishan | 3800*2 | Weixian new-gen reactor | 2021.7 |
India 4 | 5000 | Turnkey LAS SLES SLS Unit 69 Reaction Heat Recovery | 2021.4 |
Bangladesh 1 | 1000 | Turnkey LAS SLES plant | 2022.2 |
Middle east 2 | 1200 | Turnkey LAS SLES plant | 2022.2 |
Pakistan 2 | 6000 | Turnkey LAS SLES plant with Unit 68 and SLES Dilution | 2021.2 |
Indonesia 1 | 6000 | Turnkey LASBSA SLES Unit 68 plant | 2021.11 |
Yeman 1 | 2000 | Reactor replacing Italian one | 2021.5 |
China ZZY Henan | 5000*4 | 4 New-gen Reactors with Exhaust circulation process, sulfur buring and SO3 converting | 2021.1 |
China Zhongqing | 3800 | Old plant Exhaust Treatment and organic material recovery revamping, reducing consumption in exhaust 50%+ | 2021.11 |
China Zhongqing | 6000 | Turnkey SLES plant with Unit 68 Unit 38 and Unit 08 | 2021.6 |
China Jintai | 2000 | Static-mixing level-controllable aging and stabilization | 2021.1 |
China Shandongweifang | 5000 | New-gen reactor replacing old one | 2020.11 |
China Shandongjining | 3800 | LAS SLES AOS plant design | Feasibility study |
India 1 | 4000 | Turnkey LAS SLES AOS SLS plant with Unit 69 | 2020.9 |
China Tianzhi | 3800 | The second Unit 79 Neutralization replacing Double-step Neutralization | 2020.9 |
China Anyangtianhong | 800 | 19-tube reactor replacing the old | 2020.8 |
China Xinxianghuimiao | 1000 | SLS Film scraping, drying, tablet pressing and needle extrusion plant | 2020.8 |
China Anhuianqing | 3800 | Weixian reactor replacing Italian one for LAS SLES AOS production | 2020.7 |
China Lichenshanghai | 10000 | The largest ESP in the world | 2020.6 |
China Lichenguangdong | 6000*2 | Two reactors replacing Italian ones, Unit 38 | 2020.4 |
China ZZY Jiaxing | 3800 | Adopting Weixian reactor with liquid SO3 evaporation and exhaust circulation process | 2020.4 |
China Shandonglongkou | 2000 | Turnkey LAS plant | 2020.3 |
China Lichenshanghai | 6000+5000 | New 6tph plant and old 5tph Italian plant revamping including replacing reactor | 2020.3 |
China Lichenhunan | 5000 | 5tph New waste heat systme, 5tph aging vessel*2, 3.8tph ESP*2 | 2020.3 |
India 3 | 6000 | Turnkey LAS plant with Unit 79 and 68 | 2019.9 |
Vietnam 3 | 3000 | Turnkey LAS with Unit 68 | 2019.9 |
China Sasol | 1600 | Weixian reactor replacing Italian one, for sulfation of various fatty alcohol ethers | 2019.9 |
Vietnam 2 | 1600 | Turnkey SLES plant Unit 79 | 2019.8 |
Sudan | 2500 | Turnkey LAS SLES Unit 68 | 2019.6 |
China Huizhouzhisheng | 3800 | Unit 79 Neutralization replacing Vacuum Neutralization | 2019.3 |
India 2 | 2000 | Weixian reactor replacing Italian one for LAS SLES and AOS producetion | 2019.2 |
China Sichuan Jintung | 3800 | Unit 79 SLES Neutralization replacing Double-step Neutralization | 2019.2 |
Vietnam 1 | 3000 | Neutralization reactor and waste heat recovery | 2019.12 |
Pakistan 1 | 3000 | Turnkey LAS SLES Unit 68 | 2019.1 |
China Xinxianghuimiao | 1000 | SLS film scraping, drying, tablet pressing and needle pressing plant | 2019.6 |
China Xinxianghuimiao | 3800+6000 | Turnkey LAS SLES AOS SLS plant with Unit 38 Unit 69 | 2019.1 |
Ethiopia 1 | 1600 | Turnkey SLES Unit 79 | 2018.9 |
South Korea 1 | 3800 | Revamping old Italian SLES neutralization and adding pump neutralization | 2018.7 |
China Guangzhou Iiby | 1600 | Replacing old reactor for AOS production | 2018.6 |
China Anhui Jintung | 3800 | SLES Unit 79 and Unit 68 waste heat recovery | 2018.5 |
China Shijiazhuang | 600 | MES turnkey plant with 14-tube reactor | 2018.4 |
South Korea 1 | 6000 | Turnkey LAS SLES plant with Unit 68 | 2018.2 |
China Shengtailianshui | 2000*2 | Two LAS SLES AOS plants | 2017.8 |
China Shandonglibo | 3800 | SO2 and SO3 coolers | 2017.6 |
South Korea 1 | 2500 | Weixian ESP replacing American one | 2017.2 |
China Xinxianghongtai | 3800 | Turnkey LAS SLES with Unit 68 | 2017.11 |
China Shengtaixinjiang | 2000 | Turnkey LAS SLES plant with Unit 38 Waste Water Evapration and Cystalization | 2017.11 |
China Yishuidongxin | 2000 | LAS Turnkey plant | 2017.1 |
China Anyangtianhong | 800+1300 | Two turnkey plant with a 3-stage Waste Heat Recovery for hot water genaration | 2017.1 |
Ethiopia 1 | 1600 | Turnkey LAS SLES plant with Unit 68 | 2016.7 |
China Anyangxinya | 3800 | Weixian Unit 79 Neutralization replacing Vacuum Neutralization | 2016.5 |
China Tianjintianzhi | 3800 | Weixian Unit 79 Neutralization replacing Double-step Neutralization | 2016.4 |
India 1 | 2000 | Weixian 48-tube reactor replacing Italian one | 2016.3 |
China Xinxianghongtai | 2000 | Weixian new reactor replacing old one and adding AOS | 2016.11 |
Vietnam 1 | 3000 | Reactor and Unit 79 | 2015.5 |
China Kunming Liby | 3800 | Critical equipment | 2015.7 |
China Shandonglongkou | 2000 | Turnkey LAS SLES Unit 68 | 2014.4 |
Middle east 1 | 2500 | Reactor replacing old one AES LAS | 2014.7 |
China Jinandongxin | 2000 | AOS plant | 2014.10 |
China Anyangxinya | 40 | Pilot plant | 2013.2 |
China Xinxianghongtai | 2000 | Turnkey LAS SLES AOS plant with Unit 68 | 2013.9 |
China Shengtailianshui | 3800 | Turnkey SLES plant Unit 79 and Unit 68 | 2013.8 |
China Jinyu | 2000 | New reactor and revamping | 2013.5 |
China Sasol | 1600 | Unit 79 Neutralization replacing Double-step Neutralization, 1-4 dioxane content 4ppm | 2013.7 |
Vietnam 1 | 3000 | Critical equipment and Unit 79 | 2012.2 |
China Hebeijinzhou | 2000 | Turnkey LAS SLES plant LABSA.AES | 2012.2 |
China Nanjing Jintung | 3800 | Unit 68 | 2012.2 |
China Sichuan Jintung | 3800*2 | One Unit 68 Waste Heat for two plants | 2012.1 |
Syria | 1000 | LAS and SLES turnkey plant | 2012.2 |
China ZZY Shaoguan | 3800 | Turnkey LAS SLES plant | 2012.6 |
China Yishuidongxin | 1100 | Turnkey LAS plant LAS | 2012.6 |
China Shanghaijingdi | 6000 | ESP Disc-and-tube type | 2012.5 |
China Shijiazhuangtongye | 1200 | LAS turnkey plant | 2012.3 |
China Xinjirongchao | 400 | Turnkey plant | 2011.8 |
China Fushunxihua | 1600 | LAS turnkey plant LABSA | 2011.2 |
China Anhui Jintung | 120 | 3-tube reactor pilot plant | 2011.12 |
China Anyangtianhong | 1200 | Reactor and ESP | 2011.1 |
China Xi'annanfeng | 3800 | Unit 68 | 2010.9 |
China P&G Guangzhou | 1200 | Air drying unit | 2010.7 |
China Shanghaijingdi | 3000 | LAS turnkey plant LABSA | 2010.7 |
Kenya | 1000 | Instrumentation and control system | 2010.5 |
China ZZY Shaoguan | 2000 | Turnkey LAS SLES AOS and Exhaust Gas Circulation process | 2010.4 |
China Anhui Jintung | 3800 | Unit 68 and Air Drying | 2010.1 |