East Africa 2 3000 Turnkey LABSA , SLES and acid absorption plant Under Construction
Kangtai (Jinzhou) 2000 HABSA plant renovation, replace key equipment including sulfonator, ESP, main blower etc. Under Construction
Shengtai (Taizhou) 8000 Turnkey LABSA SLES plant Under Construction
Indonesia 6000 AOS unit Under Construction
North Africa 3 6000+12000 6 tph LABSA SLES plant + 12 tph sulfuric acid + waste heat power generation with isolated grid self-use balance — a fully integrated turnkey project, equipped with a 144-tube new-generation sulfonator and unit 79 neutralization and dioxane stripping for dioxane removal Under Construction
Salvador 4000 SLES Skid-mounted Dilution system, capacity 4tph to10tph adjustable Under Construction
North Africa 2 2000+3000 Italian existing plant revamp: Adding Unit 79 SLES Neutralization & dioxane stripping and Unit 89 multi-stage dioxane stripping, aiming for 1-2 ppm. Under Construction
Sasol (China) 1600 SLES Neutralization feeding system renovation Under Construction
Huimiao (Meishan)  8000 Process design and key equipment supply Under Construction
Southern Africa 3000 Turkey LABSA SLES  plant Under Construction
East Africa 1 3000 Turkey LABSA SLES  plant  
Kenya 2 3000 ESP replacement (replacing Italian cathod SS wires-type)  Under Construction
Chile  2000 ESP replacement (replacing Italian cathod SS wires-type)  Under Construction
Turkey  8000 Turnkey LABSA SLES plant, with 192-tube new generation reactor, neutralization and dioxane stripping, waste heat recovery, cold start-up, maglev main blower Under Construction
Argentina 3000 SO3 cooler replacement Under Construction
LG (South Korea) 2000 SO2 cooler replacement Under Construction
India South 4 5000 Turnkey LABSA SLES plant Under Construction
Kenya 1 2000 SO3 cooler replacement Under Construction
Germany 3800 Unit 79 Neutralization and ultra-low dioxane SLES renovation, aiming for 1-2 ppm. Under Construction
Russia 2 1600 LABSA SLES turnkey plant with a single-tube pilot plant Under Construction
Huimiao (Guangdong)  5000+8000 Process design and key sulfonation equipment Under Construction
Wilmar (Tanzania) 2000 Unit 68 Waste Heat Recovery + SO3 cooler replacement Under Construction
North Africa 1 2500 Turnkey LABSA SLES plant, with Super Silicone Continuous Air Drying Technology  (-70°C dew point, no two-tank switching fluctuations)  Under Construction
Jintung (Nanjing) 5000 5tph Reactor and 8tph ESP Under Construction
Solvay (India) 3000 AOS unit Under Construction
South-East Asia 8000 Turnkey 8tph (with 192-tube reactor, the largest)  LABSA and 10tph SLES SLS plant with Unit 69 Reaction heat recovery  (for 15%+ electricity saving)  and Unit 38 Waste Water Crystalization Under Construction
India 5 40 Turnkey single-tube pilot plant 2026.5
Lichen (Shanghai) 7500*2 Two sets of 178-tube new-seal sulfonators (three-center-tie-rod combined design), ensuring dual low levels of dioxane and free oil 2026.4
South Korea 3800 Unit 89 Dioxane Multi-stage stripping SLES renovation,dioxane content reduced to 1ppm 2026.4
Lichen  (Shanghai)  5000 Unit 69 Reaction Heat Recovery conversion reaction heat recovery for steam production 2025.9
Lichen  (Guangdong)  7200 ESP replacement (replacing Italian cathod SS wires-type)  2025.9
Richful (China) 124.8 3-tube skid-mounted pilot plant 2025.8
Mexico 5000 SLES producing unit design ,key equipment supply, ESP replacement 2025.6
 Honduras 2000 Turnkey LABSA plant 2025.5
Indonesia 5000 ESP replacement (replacing Italian cathod SS wires-type)  2025.9
Sasol (China) 2000 ESP and Sulfur furnance replacement (ESP replacement  (replacing Italian type)  2025.9
Wilmar (Malaysia) 3000 Post degassing system  2025.4
Vietnam 4 7500 Turnkey LABSA & SLES plant with 180-tube reactor, neutralization and dioxane stripping, waste heat recovery to realize hot water and steam self-sufficient, and cold start-up  2025.2
Bangladesh 2  2000 Sulfonation Plant Phase 2: Adding SLES Unit 79 Neutralization & Dioxane Stripping with pH adjustment & auxiliary units.  2024.9
Weifang (China) 3000 Turnkey LABSA plant  2025.1
Sinolight (Shaoxing) 5000 120-tube reacter set replacement 2024.12
Indonisia 5000 Old control system upgrade and 6tph ESP replacement 2024.9
Farabi (Saudi Arabia) 41.6 1-tube skid-mounted pilot plant 2024.9
Russia 3800 Exhuast gas treatment renovation and neutralization reactor replacement 2024.8
Lichen (China) 7000 Revamp non-backmixing static mixed aging system, active matter ≥ 97.5% 2024.8
Indonesia 5000 Multiple ESPs replacement (replacing Italian cathod SS wires-type)  2024.7
West Asia 3000 Reactor replacement 2024.6
Chile  2000 Reaction tube replacement 2024.6
Richful (China) 5000 Turkney HABSA plant, with Unit 68 waste heat recovery system 2024.5
Solvay (China) 1000 Exhuast gas treatment renovation 2024.4
Argentina 4000 2tph SO2 cooler  (310S)  + 4tph ESP replacement  2024.1
Ethiopia 3000 3000m3 palm oil storage tank farm 2024.1
Egypt 3000 Scrubber, heat exchanger and ESP replacement 2024.1
Solvay (India) 3000 ESP replacement 2023.12
India 1 4000 Reactor replacement 2023.11
Lizhi (Guangdong) 3800 Ultra-low dioxane SLES renovation for meeting P&G's future requirement 2023.11
Sinolight (Shaoxing) 5000 Revamping from 3.8tph to 5tph SLES plant, including reactor and other key equipment 2023.9
Bangladesh 2 2000 Turnkey LABSA plant with Waste Heat Recovery  2023.7
Lichen (Changsha) 208 Turnkey 5-tube pilot plant for producing IOS and other small batch products 2023.6
China National Institute of Chemical Industry  (CNIC)  2000 C15 alpha-olefin sulfonation sulfonate research project  2023.6
Egypt 3000 ESP replacement 2023.4
Petrochina (Huayang) 1600 Unit 68 waste heat recovery system 2023.3
Ethiopia 3800 Turnkey LABSA and sulphuric acid integrated plant  (1.2tph 98% sulphuric acid capacity) , with Unit 38 Waste Water Evaporation and Cystalization 2023.2
India 3 7000 ESP replacement 2023.1
Sasol (China) 1600 Acid Absorption Unit  2023.1
Jintung (Nanjing) 3800 Unit 68 Waste Heat Recovery 2022.11
Shengtai (Taizhou) 6000+5000 Turnkey LABSA SLES AOS plant  2022.9
Pakistan 3 3000 LABSA SLES Turnkey plant with Unit 69 Reaction Heat Recovery 2022.8
 Pakistan 1 6000 LABSA turnkey plant  (second phase) , 144-tube new-gen reactor, SLES dilution for the first plant  2022.6
Jintung (Sichuan) 3800*2 Unit 68 Waste Heat Recovery  2022.4
Turkey 6000 Turnkey LABSA SLES SLS plant with European Union PED Standard  2022.2
Huimiao (Meishan) 7500 7.5tph LABSA 10tph SLES SLS 15tph AOS plant with 180-tube reactor and waste heat recovery 2022.2
Lichen (Changsha) 4000+5000 Unit 69 Reaction Heat Recovery 2022.2
Yifeng (China ) 120 3-tube reactor pilot plant  2022.2
Sinopec (Chengdu) 2000 ESP replacement 2022.1
Tianhong (Anyang) 2000 Reactor and aging vessel  2022.1
Vietnam 1 3000 Adding Unit 68 Waste Heat Recovery  2022.1
Jintung (Anhui) 5000+1000 Unit 79 Neutralization revamping  2021.12
Jintung (Sichuan) 3800 Unit 79 SLES neutralization and 68 revamping  2021.12
Vietnam 1 3800 Unit 68 waste heat recovery and SO3 cooler 2021.8
ZZY (Meishan) 3800*2 Weixian new-gen reactor  2021.7
India 4 5000 Turnkey LABSA SLES SLS Unit 69 Reaction Heat Recovery 2021.4
Bangladesh 1 1000 Turnkey LABSA SLES plant  2022.2
West Asia 2 1200 Turnkey LABSA SLES plant  2022.2
Pakistan 2 6000 Turnkey LABSA SLES plant with Unit 68 and SLES Dilution  2021.2
Indonesia  6000 Turnkey LABSA SLES Unit 68 plant  2021.11
Yeman  2000 Reactor replacing Italian one  2021.5
ZZY (Henan) 5000*4 4 New-gen Reactors with Exhaust circulation process, sulfur buring  and SO3 convertion  2021.1
Sinolight (Shaoxing) 3800 Old plant Exhaust Treatment and organic material recovery revamping, reducing carry over in exhaust by 50%+   2021.11
Sinolight (Shaoxing) 6000 Turnkey LABSA SLES plant with Unit 68 waste heat recovery system,Unit 38 waste water crystallization and Unit 08 SO3 absorption for sulphuric acid production, world's first 4-layer layout design 2021.6
India 1 5000 Turnkey LABSA, SLES and SLS plant with Unit 69  2021.4
Jintai (China) 2000 Static-mixing level-controllable aging and stabilization  2021.1
Shandongweifang (China) 5000 New-gen reactor replacing old one 2020.11
Shandong Jining (China) 3800 LABSA SLES AOS turnkey plant design 2020.1
India 1 4000 Turnkey LABSA SLES AOS SLS plant with Unit 69 2020.9
Tianzhi (China) 3800 The second Unit 79 Neutralization replacing Double-step Neutralization  2020.9
Tianhong (Anyang) 800 19-tube reactor replacing the old one 2020.8
Huimiao (Xinxiang) 1000 SLS Film scraping, drying, tablet pressing and needle extrusion plant  2020.8
Anhuianqing (China) 3800 Weixian reactor replacing Italian one for LABSA SLES AOS production  2020.7
Lichen (Shanghai) 10000 The largest 10tph ESP 2020.6
Lichen (Guangdong) 6000*2 Two reactors replacing Italian ones and Unit 38  2020.4
ZZY (Jiaxing) 3800 Adopting Weixian reactor with liquid SO3 evaporation and exhaust circulation process  2020.4
Shandonglongkou (China) 2000 Turnkey LABSA plant  2020.3
Lichen (Shanghai) 6000+5000 New 6tph plant and old 5tph Italian plant revamping including replacing reactor  2020.3
Lichen (Changsha) 5000 5tph New waste heat systme, 5tph aging vessel*2, 3.8tph ESP*2  2020.3
India 3 6000 Turnkey LABSA plant with Unit 79 and 68  2019.9
Vietnam 3 3000 Turnkey LABSA with Unit 68  2019.9
Sasol (China) 1600 Weixian reactor replacing Italian one, for sulfation of various fatty alcohol ethers  2019.9
Vietnam 2 1600 Turnkey SLES plant Unit 79  2019.8
Huimiao (Xinxiang) 1000 SLS film Scraping drying plant 2019.6
Sudan  2500 Turnkey LABSA SLES Unit 68 2019.6
Zhisheng (Huizhou) 3800 Unit 79 Neutralization replacing Vacuum Neutralization  2019.3
India 2 2000 Weixian reactor replacing Italian one for LABSA SLES and AOS producetion  2019.2
Jintung (Sichuan) 3800 Unit 79 SLES Neutralization replacing Double-step Neutralization  2019.2
Vietnam 1 3000 Neutralization reactor and waste heat recovery 2019.12
Pakistan 1 3000 Turnkey LABSA SLES Unit 68  2019.1
Huimiao (Xinxiang) 3800+6000 Turnkey LABSA SLES AOS SLS plant with Unit 38 Unit 69  2019.1
Ethiopia 1 1600 Turnkey SLES Unit 79  2018.9
South Korea 3800 Revamping old Italian SLES neutralization and adding pump neutralization  2018.7
Iiby (Guangzhou) 1600 Replacing old reactor for AOS production  2018.6
Jintung (Anhui) 3800 SLES Unit 79 and Unit 68 waste heat recovery 2018.5
Shijiazhuang (China) 600 MES turnkey plant with 14-tube reactor  2018.4
South Korea 1 6000 Turnkey LABSA SLES plant with Unit 68  2018.2
Shengtai (Lianshui) 2000*2 Two LABSA SLES AOS plants  2017.8
South Korea 1 2500 Weixian ESP replacing American one  2017.2
Hongtai (Xinxiang) 3800 Turnkey LABSA SLES with Unit 68  2017.11
Shengtai (Xinjiang) 2000 Turnkey LABSA SLES plant with Unit 38 Waste Water Evapration and Cystalization  2017.11
Libo (Shangdong) 3800 SO2 cooler and SO3 cooler replacement 2017.6
Yishui (Dongxin) 2000 LABSA Turnkey plant  2017.1
Tianhong (Anyang) 800+1300 Two turnkey plant with a 3-stage Waste Heat Recovery for hot water genaration  2017.1
Ethiopia 1 1600 Turnkey LABSA SLES plant with Unit 68  2016.7
Xinya (Anyang) 3800 Weixian Unit 79 Neutralization replacing Vacuum Neutralization  2016.5
Tianzhi (Tianjin) 3800 Weixian Unit 79 Neutralization replacing Double-step Neutralization  2016.4
India 1 2000 Weixian 48-tube reactor replacing Italian 2016.3
Hongtai (Xinxiang) 2000 Weixian new reactor replacing old one and adding AOS  2016.11
Vietnam 1 3000 Reactor and Unit 79  2015.5
Liby (Kunming) 3800 Critical equipment 2015.7
Shandonglongkou (China) 2000 Turnkey LABSA SLES Unit 68  2014.4
West Asia 1 2500 Weixian reactor replacing Italian one  2014.7
Dongxin (Jinan) 2000 AOS plant  2014.10
Xinya (Anyang) 40 Pilot plant  2013.2
Hongtai (Xinxiang) 2000 Turnkey LABSA SLES AOS plant with Unit 68  2013.9
Shengtai (Lianshui) 3800 Turnkey SLES plant Unit 79 and Unit 68  2013.8
P&G (Beijing) 2000 American plant renovation with new reactor,aging and hydrolysis, SO3 cooling and air drying units  2013.5
Sasol (China) 1600 Unit 79 Neutralization replacing Double-step Neutralization, 1-4 dioxane content 3ppm  2013.7
Jinzhou (Hebei) 2000 Turnkey LABSA.SLES 2012.2
Vietnam 1 3000 Critical equipment and Unit 79  2012.2
Jintung (Sichuan) 3800*2 One Unit 68 Waste Heat for two plants  2012.1
Syria 1000 LABSA and SLES turnkey plant  2012.2
Dongxin (Shandong) 1100 Turnkey LABSA plant 2012.6
ZZY (Shaoguan) 3800 Turnkey LABSA SLES plant 2012.6
Jingdi (Shanghai) 6000 ESP Disc-and-tube type 2012.5
Tongye (Shijiazhuang) 1200 LABSA turnkey plant  2012.3
Jintung (Nanjing) 3800 Waste heat recovery 2012.2
Jintung (Anhui) 120 3-tube reactor pilot plant  2011.12
Fushun (China)  1600 Turnkey LABSA 2011.2
Rongchao (Xinji) 400 Oil sulphonation 2011.8
Tianhong (Anyang) 1200 New generation reactor and ESP replacement  2011.1
Note: shown above are just partial projects of Weixian

Need Help? Chat with us

leave a message
send
Contact us #
+86 18851135685

Our hours

Mon-Fri  8:00 AM - 18:00 PM

Technical Service 24 hours online.

(all hours are Beijing Time)

home

products

CONTACT