news

72 Hours Running Test Report for 2tph Film Sulphonation Plant of ZHONGQING YILAN

Jul 05, 2007

Ⅰ. During the 72 hours running period, analysis results of product quality at control points are in TABLE 1:

 

TABLE 1, data sheet of analysis results

No.

Date and time

Active matter (%)

Free oil (%)

Free sulphonic acid (%)

Color (klett)

Conclusion

1

2007-3-13 12:00

97.02

0.26

1.23

18

COMPLIES

2

2007-3-13 16:00

97.61

0.17

1.2

17

COMPLIES

3

2007-3-13 20:00

97.51

0.35

1.09

16

COMPLIES

4

2007-3-14 00:00

97.5

0.26

1.03

16

COMPLIES

5

2007-3-14 04:00

97.52

0.43

0.98

17

COMPLIES

6

2007-3-14 08:00

97.27

0.43

0.98

17

COMPLIES

7

2007-3-14 12:00

97.51

0.7

1.16

16

COMPLIES

8

2007-3-14 16:00

97.44

0.26

1.19

13

COMPLIES

9

2007-3-14 20:00

97.32

0.78

1.02

16

COMPLIES

10

2007-3-15 00:00

97.15

0.61

1.04

13

COMPLIES

11

2007-3-15 04:00

97.25

0.61

0.96

15

COMPLIES

12

2007-3-15 08:00

97.24

0.87

0.87

14

COMPLIES

13

2007-3-15 12:00

97.37

0.9

0.87

13

COMPLIES

14

2007-3-15 16:00

97.05

0.43

1.22

24

COMPLIES

15

2007-3-15 20:00

97.74

0.43

1.28

25

COMPLIES

16

2007-3-16 00:00

96.92

0.87

0.93

19

COMPLIES

17

2007-3-16 04:00

97.32

0.43

1.06

13

COMPLIES

Average

 

97.34

0.53

1.07

17

COMPLIES

 

Ⅱ. The final analysis result of 72 running test is as TABLE 2:

 

TABLE 2, The final analysis result

No.

Analysis Date and tank No.

Active matter (%)

Free oil (%)

Free sulphonic acid (%)

Color (klett)

Conclusion

1

2007-3-15 5# tank

97.02

1.34

1.14

18

COMPLIES

2

2007-3-17 1# tank

96.88

1.29

1.1

18

COMPLIES

Average

2 tank sample

96.95

1.315

1.12

18

COMPLIES

 

Test conclusion: During 72 hours testing period, the analysis results in the producing time and analysis results of final product all achieve the design requirement for this plant. 

 

 

Ⅲ. 72 hours consume quantity test-results are as Table 3:

 

TABLE 3, the design requirements and actual consume quantity

 ITEM

Requirements in contract

(per 1 MT of LAS)

Results tested by metering

(per 1 MT of LAS)

Consume quantity of LAB

≤744.0㎏/t

740.1㎏/t

Consume quantity of sulfur

≤106.5㎏/t

101.4㎏/t

Consume quantity of 30% liquid sodium hydrate

≤27.0㎏/t

13.34㎏/t

Consume quantity of electric power

≤150kwh/t

99.3kwh/t

Consume quantity of process water

≤12t/h

0.235 t/h

Consume quantity of steam

≤0.34 t/h

Not tested as don’t have test instrument

Consume quantity of instrument air

≤30Nm3/h

Not tested as don’t have test instrument

 

Test conclusion:the actual test results of consume quantity (except steam and instrument items) in 72 hours running all achieve the requirement of plant design. 

 

Ⅳ. Testing result of effluents in 72 hours running:

It’s tested by a professional inspect institution consigned by safety-production manage department. The result is as TABLE 4:

 

TABLE 4 DATA sheet of effluents of sulphonation plant.

ITEM

Requirements in contract

Test result

Conclusion

SO2 content in gaseous effluents

GB16297-96

36mg/stere

COMPLIES

The tiptop let speed permitted

≤11kg/h

2.6kg/h

COMPLIES

PH value control bound of alkali waste water

7~10

8

COMPLIES

Design requirement for the noise out of blower  house

≤85分贝

Place 1#: 82.1db

COMPLIES

Place 2#: 82.7db

COMPLIES

Test conclusion: The testing results comply to standard.

Need Help? Chat with us

leave a message
send
Contact us #
+86 18851135685

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

home

products

WhatsApp

CONTACT