This week, we're dispatching:
✅ 6 tph AOS Unit
✅ 6 tph ESP Unit
Both bound for Southeast Asia – both to the same valued customer who's expanding their operations with us.
When a client doubles down on our technology across sites, it's the strongest validation we can ask fo...
We're pleased to share that our 2.5 tph project in North Africa has officially moved into the pre-commissioning stage.
👨🏭 Our engineering team is on the ground, delivering hands-on training to local operators across key areas:
Control systems & instrumentation
Electrica...
This week, our engineers are on the ground in China, carrying out annual maintenance for a customer operating two 2 tph sulfonation and sulfation units (supplied by WEIXIAN, in service since 2020 and 2014).
From process parameter verification to sulfonator cleaning and calibration, we're maki...
It's been a big year for Weixian.
Our second 8 TPH LABSA and SLES plant in Europe is now in the equipment installation phase, building on the strong foundation work already completed.
This follows our successful test runs on two 7.5 TPH reactors in Shanghai earlier this year—and...
This week, our engineers are on-site in China commissioning two 8TPH ESP units, followed by a 5TPH neutralization and dioxane stripping system.
The summer heat is intense, but the team's focus is sharper than ever. Every degree of temperature is matched by a degree of dedication – becau...
This week, our team successfully finished the full commissioning and performance verification for the SLES dilution system before it leaves our workshop.
Always a good moment when a system rolls out—but the real work begins on-site. Looking forward to seeing it in operation and supporti...
Our team is now fully mobilized on-site, and execution is in full gear. From rigorous inventory checks of all delivered equipment to direct supervision of large-scale equipment installation — every detail is being handled with technical precision.
What makes this project particularly si...
Weixian supplied 2.5 tph LABSA/SLES sulfonation turnkey project is entering its final phase.
Our construction team is on-site handling the installation, while our engineers are overseeing every detail—ensuring the plant meets our exacting standards.
Right now, the focus has shift...
We're excited to share a fresh progress update from our European project site
The installation of the 1.6-ton LABSA/SLES plant and single-tube pilot plant is progressing steadily — and we're on track to complete it this October.
Stay tuned for more milestones along the way....
We continue to make steady progress on the 8-ton-per-hour large-scale sulfonation plant in China.
This week, we're delivering key equipment for the ESP and neutralization & dioxane stripping units, including the stripping tower, condensator, etc.
We're proud to be supplying critica...
Wishing a blessed and joyful Eid al-Adha to all who are celebrating.
May this special occasion bring you and your loved ones peace, reflection, and meaningful moments together. Whether you're spending time with family or taking a well-deserved pause, WEIXIAN team hope the days ahead are fille...
After two days of intensive packing preparations, WEIXIAN designed and fabricated equipment for our first 8 tph 192-tube sulphonation plant for Southeast Asian client has finally been shipped.
Our engineers supervised the entire packing process on-site to ensure:
🔹 No items were omitte...