Products
  • Unit 06 Recycle Water Station
    It is consisted of one circulating water basin, water supply pump for circulating water, water treatment system, circulating water filter etc. The circulating water pump outlet pressure is displayed and alarmed intensively by the computer. Circulating water pump A is the main pump, B is assisting pump and its power is 25% of A and only used in summer. This unique design has resolved water supply peak in summer, and also save the power in spring, autumn and winter.  
  • Unit 15 pH Adjustment
    The pH adjustment unit is to stabilize the pH value, homogenize the product and fine-tune the specifications when producing SLES and SLS.   When the finished product enters the adjustment unit and reaches a certain liquid level, the agitator will stir at a constant speed at the set rpm. Generally, this unit is equipped with multiple stirring tanks and works intermittently.   During the operation of the unit, controlling and testing is required to take samples at regular intervals to check parameters such as product neutralization value, pH, free oil, dioxane, color, etc. When the product quality is stabilized, it will be delivered to the tank farm.   In addition, an optional post deaeration system can be added in order to remove excess air bubbles from the adjusted products, resulting in a more transparent and better looking product.
  • LABSA-Na, AOS and SLS Drying Unit
    WEIXIAN provides turnkey plant for LABSA-Na, AOS and SLS drying. Depending on the properties and customer’s requirements, we can provide two types of process: film-scraping and spaying. Please contact us for details.
  • Unit 38 Waste Water Crystallization
    The hot air generated from the first layer of the converter and SO3 second cooler can be used for silica gel regeneration, extra hot air produces steam and hot water for raw material and finish product heat tracing. Then partial remaining hot air (100℃) further goes to Unit 38 to treat the wastewater coming from the scrubber. Crystal Na2SO4 hydrate will be produced by oxidizing the NaSO3 and Na2SO4, and evaporating water in the wastewater. Therefore, the plant can realize ZERO wastewater discharge from scrubber. 
  • Unit 69 Reaction Heat Recovery
    The main reaction heats from the sulfur furnace and the converter generate steam directly by using a fire-tube boiler.   Compared with the traditional technology, this process generates twice steam. Apart from being used in the sulfur melting unit, the steam can fully fulfill the requirement of chilling in air drying unit by replacing the electric driven chiller with steam driven lithium bromide chiller for generating chilling water. The power consumption can be 15% lower. 
  • Exhaust Gas Circulation Process
    Patented revolutionary technology. It circulates the system exhaust gas from the ESP outlet to the main process air, raises gas pressure and adds oxygen, then goes through the process of sulfur burning and conversion, sulfonation, and exhaust gas treatment. It manages to reuse the exhaust gas discharged from the ESP, and reduces the exhaust gas discharged to the atmosphere by 96% (meaning only 4% actual emission compared with the traditional process). Meanwhile, this process reduces the caustic soda unit consumption by 7kg on 100% basis, and 2-3kg sulfur.
  • Turnkey Sulphonation Plant
      WEIXIAN sulphonation/sulfonation plants represent the highest level in the industry. So far, we can provide from a one-tube pilot plant to 10t/h mass production plant. Among 200+ projects we have done, the majority of them were turnkey basis, including but not limited to:    · LABSA (sulfonic acid) production line · SLES production line · SLS production line · AOS production line · HABSA production line · MES production line · SLS/AOS/sulfonic acid sodium salt drying units · Other anionic surfactant production lines   By adopting state-of-the-art designs and processes, all the performance aspects including plant reliability, finished product qualities, and unit raw material/power consumption are superior to that of competitive plants.
  • Sulphonation/Sulphation Reactor
    WEIXIAN sulfonator adopts multi-tube falling film reactor. Capacity range is from 1-tube to 240-tube (10t/h). Since 1995, WEIXIAN has supplied hundreds of sulfonators, including 20+ with the capacity over 5t/h. WEIXIAN has successfully applied two world largest 7.5t/h sulfonators in by 2023.   1. Organic material distribution system in the head of reactor   After calibration, the flow deviation reaches ±1.5%. The distribution head and nozzles are one-time clamped processed and formed by a CNC machine to ensure that the tolerance of major dimensions reaches ± 0.005mm, and minor dimensions ± 0.01mm.   2. Finish degree of reaction tube inner wall   Regarding the reaction tubes, high precision cold rolling and annealing are applied, and processed under a 1040℃ vacuum condition to remove inter-molecular stress. Those treatments make sure the inner and outer surfaces’ finish degree of each tube reaches level Ra0.4 (like a mirror); the deviation of the inner and outer diameter of the reaction tube is controlled at less than ± 0.02mm.   3. The welding and flaw detection method of the distribution head and the reaction tube   High-frequency welding + argon arc welding are applied between the distribution head and the reaction tube. The welding form is fillet welding. The flaw detection method is nondestructive testing. For each tube, we applied 0.6Mpa hydrostatic test and endoscopic exploration for weld formation and inner pipe accuracy testing.   4. Concentricity of three tube sheets   All three tube sheets are processed with the same coordinate in the machining center. Tube concentricity tolerance reaches ± 0.01mm. All three tube sheets will be stacked and fixed together according to the installation position and checked each holes by inspection mandrel one by one with concentricity deviation less than ± 0.01mm.     5. Sealing reliability   5.1 The cooling water sealing between the shell side upper section and middle&lower section The cooling water enters into the second and third parts and exits from the third part of sulfonator. The first (upper) part has to be strictly isolated to ensure the separated circulation of chilling water (15℃), which is crucial for better product quality, especially for AOS.   5.2 The two-way sealing between sulfonator upper part SO3 and organic material In tube sheet 1, the compressing screw head adopts a combined screw head + three combined gaskets type, which forms a reliable two-way sealing. It realizes 100% isolation of the oleum and prevents rusting and leaking.   5.3 The sealing of cooling water between the distribution head and shell side Adopting a new type of sealing structure greatly improves the pressure resistance of the shell side. The shell side test pressure can be greater than 0.6Mpa, and the water is able to return with pressure. All sealing parts are made out of special fluororubber O-rings, with 100% sealing efficiency, and lifetime replacement free.   5.4 The sealing of cooling water between the reaction tube’s lower part and the shell side Applied fluororubber O-rings, the sealing efficiency is 100%, and lifetime replacement free.   6. Other Technical advantages of our sulfonator   6.1 Extended operation period: LABSA continuous production period reaches 40+ days;   6.2 70% SLES continuous production period reaches over 3 months;   6.3 AOS continuous production period reaches 25+ days;   6.4 Easy sulfonator calibration: First start-up flow deviation is able to reach ±1.5%. The thickness of replacing gaskets are from 1.8~2.2mm (standard thickness is 2mm). Top level products quality and extended sulfonator washing interval can be ensured.   6.5 Yield flexibility: LABSA capacity adjustment range 55%~115% 70% SLES capacity adjustment range 80%~140%
  • Aging Vessel
    Unlike the former rotating type with an agitator, ours is a static type, which is featured in more homogeneous aging effect with no back-mixing. By adopting a special inner structure, each material molecular in the static aging vessel will have equal residence time (staying time). On the contrary, the residence time of each molecular in a rotating aging vessel is uneven, which shows a normal distribution. Our aging time is adjustable from 0-60 minutes by controlling the liquid level in the vessel. Normally, the aging time is set to be 30 minutes; when a higher active matter percentage is required, for example, 97.5% - 98% LABSA, the aging time can be set to 45 - 60 minutes. Besides the performance, power consumption and maintenance requirements are reduced due to the nature of static equipment.
  • Stripping Tower
    Stripping tower 79T1 is static equipment, without motor or rotating parts. Compared to outdated technology, our stripping tower doesn’t need maintenance. WEIXIAN designs the stripping tower based on the characteristic of sulfonated/sulphonated products. In the stripping tower, degassing, water removal, dioxane stripping, and cooling can be achieved in the same equipment, which can save power consumption, and ensure stable running and product quality.
  • Neutralization Reactor
    The high-shear neutralization reactor is composed of multiple high-speed dispersing shearing discs, and the mechanical seals and bearings are all customized for high-speed mixing/shearing purpose. Stable operation at 960 rpm.   The neutralization reactor has the advantages of efficient and uniform mixing, flexible operation, stable system pressure, and low failure rate.
  • ESP (Electrostatic Precipitator, for sulfonation/sulfation plant use only)
    It adopts the cathode plate hollow-out design to avoid “black acid” accumulation. Cathode SS wires are replaced by SS tubes, in order to eliminate the risk of breaking.   The working voltage is 40,000 V, featured in excellent SO3 and organic acid mists removal performance.
1 2 3

A total of3pages

We Look Far Ahead To Be Closer To You
WEIXIAN is an engineering company specialized in supplying turnkey sulphonation/sulphation plant and it's technology, focusing on the R&D of LABSA, SLES, SLS, AOS, HABSA, MES and other anionic surfactant production technologies.
Learn More
  • 0+

    OVER 30 YEARS HISTORY

  • 0+

    CARRIED OUT OVER 200 PROJECTS

  • 0+

    Supplied The World Largest 8T/H Plant

  • 0+

    COVERED 17 COUNTRIES IN THE WORLD

Need Help? Chat with us

leave a message
send
Contact us #
+86 18851135685

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

home

products

WhatsApp

CONTACT